Search
You are here: Home > News > 技术支持

Mobile stand bracket pool and pond

2015/10/17 10:27:24

Brief introduction
Bracket pool is a combination of steel and processing Fabric ether Ethylene pvc fabric made. The main support for the pipe, the pool body with pool dedicated for fine-sided PVC-coated nylon fabric and high-frequency welding hot forming. Having high tear (tear strength 400N, tensile strength 3478N / cm), abrasion, aging, beautiful appearance and easy setup, use of safe, clean, no special venue. Bracket Pool conventional rectangular shape, can also be based on site size, custom-made to adapt the size of the venue. General height of 60cm - 150cm, length and width dimensions in the range of 2x2m to 50x25m.
2 Historical origin
Swimming has always been a favorite of the general public a fitness recreational sports, but under severe constraints and other natural conditions and safety issues, on the other hand, to investment in the construction of stadiums, and restricted funds, planning and site factors of , it is not easy to achieve. Due to the high cost of the swimming pool, and a year take advantage of a short time, thus resulting in a high cost of the pool, and the bracket pool is in this situation came into being.
3 Advantages
Bracket pool with mobile convenience, flexible, easy to use, in the size of the stadium, leisure resorts, tourist attractions and a variety of venues. Latest first use of foreign domestic original fabrication of large heat sink bracket, production process heat sink has a large stent wear pressure, not crack not a plastic, etc., none of Epoxy entire pool, bottom bracket pool cloth used 0.85pvc, stent using using pipe wall thickness of 2.5 GB, high-quality mobile style pool has 10 years of long service life.
4 social
National 669 cities in 400 inadequate water supply, 110 serious water shortages; millions of people in more than 32 big cities, there are 30 long plagued by water shortages. In 46 key cities, 45.6 percent of poor water quality, 14 coastal open cities in nine serious water shortages. Beijing, Tianjin, Qingdao, big summer entertainment of the public to solve the problem will be prominent even the most severe water shortages and other cities. With global warming, extreme weather 40 ℃ summer break, more and more frequently published around the high temperature warning, with the rapid development of urban construction, land prices rising, rest leisure activities available to the public less and less. For seasonal playground demanding conditions, the conventional construction of a swimming pool must be invested tens of millions more to build a swimming theme park based on the investment in more than 10 million business and facing Zhaomang quarter, three quarters of the maintenance of embarrassment. Bracket pool appears to solve the above problems, a bracket pool only need tens of thousands of dollars can solve people's demand for summer swimming.
5 Maintenance work
Swimming-pool maintenance
Bracket pool maintenance is reflected in two aspects of the maintenance of steel and pvc fabric maintenance. Steel frame should always use a damp cloth to keep clean, avoid rusting steel paint chips.
The maintenance of pvc fabric, reflected in the daily water circulation system application, holding bracket pool filled with water and clean; each quarter after use, to wipe green moss pond bottom, then cool drying, packing storage.
First, the drained swimming pool, and then let go of the edge of the gas chamber, for cleaning.
Second, clipping patch sheet. Patching sheet to cut three times the size of the repair area, preferably round or oval.
Third, the first backing plastic handle. Wipe the area to be repaired and the repair sheet clean, evenly coated with special glue, then use the hair dryer blowing sticky, dry naturally can.
Fourth, the fight fill plastic handle. To just dry the repair area and patch again evenly coated sheet special glue, supra process to tack.
Fifth, stick and. The patch sheet aligning repair area, slowly paste from one direction, be careful not to produce bubbles, and then hand pressed flat.
Sixth, press firmly. After sticking a hard object placed on top of a flat, smooth top with weights can be hard pressed to 24 hours after use.
Quality Care
First, the algae and antibacterial:
Put copper sulfate per 1,000 cubic meters of water delivery 2-3 kg is appropriate, if the process is to put in new water shall be doubled. Place 1-2 times a month is better (and put in two hours after the drug could do the following steps).
Second, sterilization, disinfection:
Use TCCA (TCCA, TCCA) powder or tablets for disinfection, generally every cubic meter of water a dose of 2 g dosage. Dosing time of 1-2 hours is best placed in front of the open conduct. If in the middle of supplemental dose is 0.5ppm increase its chlorine content per cubic meter of water required per 2 g were dosing.
Third, adjust the PH (acidity):
Sodium hydroxide is used to improve the pool water PH value, so that PH value of about 7.5 (increase 1.0 per cubic meter of water per gram dose delivery 5-10).
Fourth, put in water purification agent (precipitation):
Use PAC (powder), generally 5-10 grams per cubic meter of water dose delivery. Best to keep water circulating half an hour after delivery to the water after alum, still 6-8 hours before they were vacuuming. Administration is preferably carried out in the evening to end.
Fifth, smoke pollution:
After the precipitant, sewage suction can be conducted.
NOTE: In the 1-4 step is carried out, if the water circulation system should be put in open circulatory system so that the agents are uniformly dispersed in the water; such as anhydrous circulatory system, should try to find ways to make it uniform.